Stream Crossings
Click the presentation title to watch the recorded training. All presentations are formatted as mp4 videos.
Available Courses
- Visit the Stream Crossing Training webpages for information on available in-person training offerings and registration.
Pre-requisites to CD Stream Crossing Replacement Certification Training:
- Stream Standard: (148 MB) (~41 minutes) Overview and Q&A on DGLVR Stream Crossing Replacement Policy
- Stream Policy: (182 MB) (~41 minutes) Overview and Q&A on DGLVR Stream Crossing Design and Replacement Standard
- Stream Technical Manual: (57.6 MB) (~34 minutes)Overview and Q&A on DGLVR Stream Crossing Replacement Technical Manual
- Session #1: (466 MB) (~3 hours, 9 minutes) Concepts of stream morphology, initial site assessment, and administrative and policy requirements.
For Engineers
- Stream Crossing Training for Engineers Course: Consists of a half day remote session followed by 1 day in the field and classroom. Includes topics and discussion related to meeting the DGLVR Stream Crossing Design and Installation Standard and restoring stream continuity. Please visit the training page for more information and registration.
- DEP GP11 Stream Crossings for Engineers: (218 MB) (~2 hours, 24 minutes) DEP central office staff presented this webinar directly to engineers who attended one of the 1.5-day DGLVR “Stream Crossing for Engineers” trainings in 2023. The webinar included presentation and discussion on often questioned topics related to the GP11 such as raising the road elevation, stream realignments, and channel work further away from the structure. (12/2023)
- Presentation: Adobe PDF (12.7 MB)
Supporting Webinars for Conservation Districts
- Stream Crossing Exemptions and Notifications: (112 MB) (~41 minutes) This webinar reviewed the notification and exemption process for stream crossings with some examples. (1/2023)
- Stream Crossing Replacement Site Prioritization: (94 MB) (~1 hour) This webinar will focus on site characteristics and various metrics that can be utilized to identify high priority stream crossing replacement sites. Districts can use this to steer municipalities into applying for these sites and consider incorporating these metrics into the local ranking criteria. Will include discussion of various existing tools that can be used to identify high priority sites as well as leveraging other funding sources. (2/2025)
- Stream Crossings – Status Update and Emerging Issues: (133 MB) (~1 hour, 19 minutes) Status update on the implementation of the new stream crossing standard. Included a review of some recent issues encountered on projects and conservation district responsibilities. (2/2024)
- Online Longitudinal Profile Tool: (133 MB) (~1 hour, 1 minute) The Center has been working with developers at Penn State to turn the excel-based “Long-Pro Tool” into an online program. This tool can be used by CDs and others to input longitudinal profiles surveys for potential stream crossings to generate potential recommendations. The new online “Long Pro Tool” is more user friendly than the excel version, and provides an online repository for this data. The tool is located in the Stream crossings general resources webpage. (1/2024)
- Stream Crossing Replacement Monitoring: (84.6 MB) (~ 33 minutes)This session included a recap of a multi-year study on Hammond Run (large squash pipe replaced on Shaver’s Creek Road in Huntingdon and shown at workshops). It also included some ideas and discussions for CDs who might be interested in implementing some monitoring of their own for stream crossing replacement projects. (2/2023)
Example Projects
- Project Spotlight: Stream Crossings to Standard: (103 MB) (~55 minutes) A walkthrough of some of the first few stream crossing installations completed under the DGLVR standard in 2024. (1/2025)
- Spread Footer Bridge Showcase: (465 MB) (~1 hour, 32 minutes) This webinar reviewed the basics of spread footer designs and provided some examples as a potential option for stream crossing replacements. (1/2023)
Permitting
- DEP GP11 and Stream Crossings Update / Discussion: (99.1 MB) (~ 1 hour, 6 minutes) DEP staff presented updated GP11 information related to the previously released permit memo that outlines the potential for structure realignments, increasing road fill height, and length of in-stream work for crossing replacements. (3/2023)
- DEP Chapter 105 Permitting Examples: (112 MB) (~58 minutes) Building off the 3/30/23 webinar, DEP staff expanded on some of the common issues and questions related to GP-11 and stream crossing replacements. This session focused mostly on DEP permit expectations and example situations. (6/2023)