Additional resources on stream crossing replacements outside of the certification training.
Supporting Webinars
- Shavers Creek 11’ Bottomless Arch Pipe Walkthrough: Virtual walkthrough of the project including planning and design, and photo and time-lapse overview of installation. (3/2021)
- Webinar Download (358 MB): MP4 format (~ 1 hour 2 minutes)
- Presentation: Adobe PDF (97.1 MB); MS Powerpoint (116 MB)
- Stream Crossings: The Good, The Bad, and The “In-Between”: Review of a wide variety of stream crossings, common issues, and lessons learned, from QAQCs from 2018 through 2020. (2/2021)
- Webinar Download (251 MB): MP4 format (~ 1 hour 21 minutes)
- Presentation: Adobe PDF (16.6 MB); MS Powerpoint (17.1 KB)
- Structure Selection Technical Bulletin: Introduction and walkthrough of a new “structure selection” technical bulletin. (5/2020)
- Webinar Download (176 MB): MP4 format (~ 42 minutes)
- Presentation: Adobe PDF (633 KB); MS Powerpoint (1.49 MB)
- New Stream Crossing Bulletins: Bankfull Guidance: Introduction and walkthrough of a new “bankfull guidance” technical bulletin. (4/2020)
- Webinar Download (130 MB): MP4 format (~ 38 minutes)
- Presentation: Adobe PDF (10.3 MB); MS Powerpoint (15.9 MB)
- DEP GP11 Clarification Memo: DEP provided a clarification memo pertaining to GP11s for the DGLVR Program. DEP Central office participated in this webinar as well. (4/2020)
- Webinar Download (94.6 MB): MP4 format (~ 1 hour 14 minutes)
- Presentation: Adobe PDF (943 KB); MS Powerpoint (2.09 MB)