DCNR Bureau of Forestry Resources
Note that many of the documents below are also located elsewhere on the Center’s website. This page is intended to provide an easy to access “forestry focused” list of documents and resources.
Worksite in Focus
2010
- Tiadaghton State Forest – Slate Run and Francis Roads (673 KB): Use of “soil nails” to stabilize two sections of landslide-prone road. (1/11)
2008
- Westmoreland County – Linn Run Road (299 KB): Paved forest road was ripped up and returned to gravel to reduce maintenance costs. (9/08)
2007
- Pike County – Whittaker Road (299 KB): Two high-water-bypasses were installed to control flood flows on this section of road that is prone to washouts. (2/08)
2006
- Tioga County – Francis Leetonia Road (130 KB): Road relocation project to move road away from stream in conjunction with the Bureau of Forestry.(3/06)
Other Resources
- Winter 2010-11 Newsletter (1.54 MB): Spotlight on the PA Bureau of Forestry’s Dirt and Gravel Road Program (includes “Worksite in Focus” insert).